The Drill Hall at 174–178 Mile End Road is a landmark headquarters that seamlessly blends its rich historical legacy with modern innovation. Originally used as a drill hall for reserve army units, it was home to the 1st Anti-Aircraft Division Battalion during 1939, where troops trained in defense tactics. The restoration pays homage to its storied past, retaining features like exposed brickwork while transforming the space into a vibrant and contemporary environment designed to meet the needs of today’s occupiers.
This 19,500 ft² building has been thoughtfully reimagined to promote wellbeing and productivity. Bright, airy interiors benefit from excellent natural daylight through double-glazed openable windows, a large skylight, and generous floor-to-ceiling heights. Outside spaces, including tranquil courtyards, terraces, and balconies, create inviting areas for work, relaxation, or collaboration. The building is equipped with modern amenities such as energy-efficient lighting, a new air conditioning system, and advanced end-of-journey facilities, all contributing to its BREEAM ‘Very Good’ rating and EPC A(14) certification.
Careful attention has been given to every design detail, ensuring the space is both functional and visually striking. Polished finishes, activated staircases to encourage physical activity, and flexible layouts cater to a variety of uses across five floors. With landscaped courtyards, rooftop terraces, and seamless integration of historic and contemporary elements, The Drill Hall offers an exceptional workspace for forward-thinking occupiers. Seven apartments are also available by separate negotiation, adding a residential element to this unique and inspiring development.
Client - Mantra Hay Ltd
Project Manager - Hillcrest
Cost Manager - SPH London
Structural Engineer - Parmabrook
MEP Engineer - LMEP
Planning Consultant - Savills
Commercial Agent - Anton Page
Awards AJ Architecture Awards 2024, Shortlisted